Bathroom Renovation – A Step by Step Guide

Toilets are one of the smallest rooms in the house and they are additionally one the most expensive to renovate. Toilet maintenance is a job that, if finished nicely, can add value to a domestic and a splendid space complete of design and mild.

Lavatory layout

Rest room design is the first area of your rest room protection you want to get right. Simply replacing the existing toilet with the same layout won’t be sufficient. The key to fantastic lavatory layout is to design it with the humans that are going to use it in mind. But be sure that your toilet design additionally has a wellknown use factor as well. As an example: in case you have been designing a bathroom for households you can nevertheless layout the toilet with clean access to the shower and bath. This would make certain that the layout would also paintings for human beings with restricted mobility. This means if making a decision to sell your property or in case you are renovating for income your layout has a much broader market appeal. Super bathroom design also uses the distance nicely, taking into consideration the mild or window area, size of fittings, and drainage options. Draw out a plan to scale and right down the sizes of your room. Mark the prevailing drainage points after which and water inlet points. Write down a desire listing of the rest room fittings to need and need with their sizes. Now marry the two together and notice what fits. Word: maximum bathroom drainage and water inlet factors can be moved however this does come at greater cost.

Rest room redesign

If you have determined to do the paintings your self or part of the work it is time to rent a bypass bin and pull out the old rest room. If your home changed into made pre 1980 you may have fibro lavatory wall linings with asbestos in it and excellent care will want to be taken. You may need some full frame disposable overalls, eye protection, and high-quality dirt masks. Test along with your neighborhood constructing authority or council regarding the law on lavatory asbestos wall lining removal.

Eliminate the whole lot except the plumbing. If you preserve the bathroom plumbing in region you will no longer have to turn the water off for the whole house. Additionally you may want to jack hammer the floor tiles up and the sand and cement bed that they are laid on.

Lavatory maintenance and creation

Bathrooms have to be construction nicely from the floor up to make certain that the finished job is accurate and authentic. This additionally guarantees the layout and look of the toilet can have a fantastic end

The rest room upkeep manner

Installation water and drainage pipe and electric wires.
Install wall lining and ceiling and then deploy the tub hob and bath.
Water-proof the ground and bathe and bathtub recess.
Correct the fall of the floor with sand and cement geared up for tiling.
Lay floor and wall tiles and then grout.
Deploy new rest room arrogance, fittings, and faucets – installation new electrical.
Paint ceiling and very last clean.

The 1 step – Plumbing and electrical

At this point all new plumbing is set up for clean warm and cold water and drainage. Careful attention needs to be taken while positioning the brand new plumbing so that the plumbing fittings are accurate while the tiling is completed. For instance: To centre a becoming in a bath recess you need to think about the thickness of the wall board, tile glue and tile so the fitting can be concentrated after the tiles are in vicinity. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into consideration so the pipe is in the appropriate role when the bathroom is hooked up after tiling. Also difficult within the any new electric wires without connecting them to the mains energy.

Step 2- deploy wall and ceiling linings

Deploy your 6mm wall lining being cautious to nail the fibro board every 150mm without nailing into the new pipes and electric wires. The satisfactory way is to measure and mark the pipe and cord format onto your new wall board with a pencil as you pass. Screw up (or nail) the ceiling lining, plasterboard is the most common. But if you are laying your tiles from ground to ceiling do now not set up the cornice as this is best completed after tiling. In case you aren’t tiling to the ceiling pass beforehand and installation the cornice after the wallboard and ceiling lining had been installed. Also in case your bath isn’t always freestanding you could now make up the body and set up the bath. Make sure the tub is established efficaciously bearing in mind the thickness of the tiles and glue.Be sure to test all linings and pipes earlier than you keep with your bathroom maintenance.

Step 3- water-proof your bathroom

Water resistant your bathroom ground, bathe recess, and around the bathtub. Whilst waterproofing the ground ensure that the waterproofing comes 100mm up the partitions. The bathe recess will need to be waterproofed 100mm above the shower rose outlet. Additionally the tub ought to be waterproofed 100mm above the lip of the tub right around and to the ground. At the doorway installation a 25 x 25mm aluminum perspective glued into location with great silicone and water-resistant into the lip. Your entire lavatory ought to now the tanked, so the all water will most effective go down a drain. Lavatory waterproofing tip: waterproofing is an easy job however best and accuracy is maximum vital.

Step 4 – Lay within the cement screed for the floor.

Before the floor tiles can laid the floor need to be clean and pretty flat with a slight fall to the drainage outlet. To do that you ought to use sand and cement blend and it is nice to feature a waterproofing agent into this as properly. With a level, set the ground stage at the doorway. Use the pinnacle aluminum angle as the finished floor level and measure down the thickness of the tile plus 10mm for the glue. Mark right around the toilet with a level after which screed to your sand and cement blend with a 1 to 3 diploma fall to the pinnacle of the drain outlet. Take your time and get it proper with the finished stage as clean as feasible. While the sand cement mix has set but is not dry (you could stroll on it but you it’s miles nevertheless a chunk smooth) rub it over with a residence brick. This may eliminate all the small highs and lows and check with a degree as you go. Let the bathroom ground completely dry and then you should have a tremendous floor to tile onto. Tip: the greater work you placed into the ground screed the simpler your tiling may be.

Step 5: Tile floor and walls

Lay your tiles at the ground first after which grout. Then lay your wall tiles ensuring that they’re level as you lay. As soon as the rest room tiles have been reduce and laid, grout all of your tiles after which buff the tiles clean.

Step 6: install plumbing fitting and fixtures

Install all your plumbing fittings and faucets. Additionally match all your towel rails and soap holders. Match your new lavatory arrogance making sure it is stage and sealed across the pinnacle with silicone and also seal around the bath. Tip: make sure they may be within the proper location earlier than you drill into your tiles.

Step 7: painting, and cleaning – revel in

Paint your ceiling and do a very last smooth making sure everything is fitted successfully and that there are not any leaks to your plumbing. – enjoy your new toilet.